US Bridges

Poplar Hill Road over Middle Creek

Good

Adams County, Pennsylvania · 2.4 MI NW of Fairfield · Structure no. 000000000056892

Built
2018
7 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
25
2019 count
Owner
State
State Park, Forest, or Reservation Agency

About this bridge

Poplar Hill Road over Middle Creek is a prestressed concrete box beam or girders - multiple carrying Poplar Hill Road over Middle Creek in Adams County, Pennsylvania. It was built in 2018, so it is 7 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 10% of them trucks, projected to reach 30 by 2049. The structure is 44 ft (13.4 m) long and 23 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesPoplar Hill Road
CrossesMiddle Creek
Location2.4 MI NW of Fairfield
RouteState Lands Road 0
Coordinates39.80219, -77.40764
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.5 US tons
Inventory rating44 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length44 ft (13.4 m)
Longest span42 ft (12.8 m)
Deck width23 ft (7 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2019)
Projected traffic30 by 2049
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Park, Forest, or Reservation Agency
Maintained byState Park, Forest, or Reservation Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Poplar Hill Road over Middle Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is Poplar Hill Road over Middle Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Poplar Hill Road over Middle Creek carry?

About 25 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is Poplar Hill Road over Middle Creek?

The structure is 44 ft (13.4 m) long with a longest span of 42 ft (12.8 m) and a deck 23 ft wide.

Who owns Poplar Hill Road over Middle Creek?

It is owned by the State Park, Forest, or Reservation Agency.