US Bridges

SE 8th St. over HWY 39

Good

Yamhill County, Oregon · HWY 039 MP 56.19 · Structure no. 22005 000 00000

Built
2016
9 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
250 ft
2 main spans
Daily traffic
11,914
2022 count
Owner
State
State Highway Agency

About this bridge

SE 8th St. over HWY 39 is a prestressed concrete continuous stringer/multi-beam or girder carrying SE 8th St. over HWY 39 in Yamhill County, Oregon. It was built in 2016, so it is 9 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,914 vehicles a day, roughly 6% of them trucks, projected to reach 17,000 by 2042. The structure is 250 ft (76.2 m) long and 52 ft wide. If it were closed, the detour would be 123 mi (198 km).

CarriesSE 8th St.
CrossesHWY 39
LocationHWY 039 MP 56.19
RouteCity Street 0
StateOregon
Coordinates45.27512, -122.99919
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating27.9 US tons
Inventory rating21.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length250 ft (76.2 m)
Longest span125 ft (38.1 m)
Deck width52 ft (16 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,914 (2022)
Projected traffic17,000 by 2042
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed123 mi (198 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SE 8th St. over HWY 39 built?

It was built in 2016, making it 9 years old in 2025.

What condition is SE 8th St. over HWY 39 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SE 8th St. over HWY 39 carry?

About 11,914 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is SE 8th St. over HWY 39?

The structure is 250 ft (76.2 m) long with a longest span of 125 ft (38.1 m) and a deck 52 ft wide.

Who owns SE 8th St. over HWY 39?

It is owned by the State Highway Agency.