US Bridges

Lombard Extension over Beaverton Creek

Good

Washington County, Oregon · 001 North of Canyon Road · Structure no. BC007 000000000

Built
1988
37 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
35 ft
1 main span
Daily traffic
2,833
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lombard Extension over Beaverton Creek is a concrete culvert carrying Lombard Extension over Beaverton Creek in Washington County, Oregon. It was built in 1988, so it is 37 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,833 vehicles a day, roughly 10% of them trucks, projected to reach 3,125 by 2025. The structure is 35 ft (10.6 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLombard Extension
CrossesBeaverton Creek
Location001 North of Canyon Road
RouteCity Street C0000
StateOregon
Coordinates45.49012, -122.80172
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating20.7 US tons
Inventory rating16.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length35 ft (10.6 m)
Longest span35 ft (10.6 m)
Deck width59 ft (18 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,833 (2020)
Projected traffic3,125 by 2025
Trucks10%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lombard Extension over Beaverton Creek built?

It was built in 1988, making it 37 years old in 2025.

What condition is Lombard Extension over Beaverton Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Lombard Extension over Beaverton Creek carry?

About 2,833 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is Lombard Extension over Beaverton Creek?

The structure is 35 ft (10.6 m) long with a longest span of 35 ft (10.6 m) and a deck 59 ft wide.

Who owns Lombard Extension over Beaverton Creek?

It is owned by the City or Municipal Highway Agency.