US Bridges

SW Spring Hill RD over Tualatin River Overflow

Fair

Washington County, Oregon · 002 MI S R/R X-Ing · Structure no. 22571 000 00040

Built
2017
8 years old
Condition
Fair
inspected September 2023
Type
Tee Beam
Prestressed Concrete
Length
200 ft
2 main spans
Daily traffic
1,098
2020 count
Owner
County
County Highway Agency

About this bridge

SW Spring Hill RD over Tualatin River Overflow is a prestressed concrete tee beam carrying SW Spring Hill RD over Tualatin River Overflow in Washington County, Oregon. It was built in 2017, so it is 8 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,098 vehicles a day, roughly 7% of them trucks, projected to reach 1,243 by 2025. The structure is 200 ft (61 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSW Spring Hill RD
CrossesTualatin River Overflow
Location002 MI S R/R X-Ing
RouteCounty Highway 0
StateOregon
Coordinates45.47805, -123.1273
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55 US tons
Inventory rating42.5 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHL 93
Structure length200 ft (61 m)
Longest span100 ft (30.5 m)
Deck width33 ft (10 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,098 (2020)
Projected traffic1,243 by 2025
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SW Spring Hill RD over Tualatin River Overflow built?

It was built in 2017, making it 8 years old in 2025.

What condition is SW Spring Hill RD over Tualatin River Overflow in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does SW Spring Hill RD over Tualatin River Overflow carry?

About 1,098 vehicles per day (2020 count), of which roughly 7% are trucks.

How long is SW Spring Hill RD over Tualatin River Overflow?

The structure is 200 ft (61 m) long with a longest span of 100 ft (30.5 m) and a deck 33 ft wide.

Who owns SW Spring Hill RD over Tualatin River Overflow?

It is owned by the County Highway Agency.