Park Entrance Road over W Fork Dairy Ck (trib)
GoodWashington County, Oregon · Stub Stewart · Structure no. 19923 000 00003
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 101 ft
- 1 main span
- Daily traffic
- 75
- 2010 count
- Owner
- State
- State Park, Forest, or Reservation Agency
About this bridge
Park Entrance Road over W Fork Dairy Ck (trib) is a prestressed concrete stringer/multi-beam or girder carrying Park Entrance Road over W Fork Dairy Ck (trib) in Washington County, Oregon. It was built in 2004, so it is 21 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, roughly 5% of them trucks, projected to reach 80 by 2030. The structure is 101 ft (30.9 m) long and 33 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Park Entrance Road over W Fork Dairy Ck (trib) built?
It was built in 2004, making it 21 years old in 2025.
What condition is Park Entrance Road over W Fork Dairy Ck (trib) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Park Entrance Road over W Fork Dairy Ck (trib) carry?
About 75 vehicles per day (2010 count), of which roughly 5% are trucks.
How long is Park Entrance Road over W Fork Dairy Ck (trib)?
The structure is 101 ft (30.9 m) long with a longest span of 100 ft (30.5 m) and a deck 33 ft wide.
Who owns Park Entrance Road over W Fork Dairy Ck (trib)?
It is owned by the State Park, Forest, or Reservation Agency.