US Bridges

I-84 (hwy 002) over Mosier Creek

Good

Wasco County, Oregon · In Mosier · Structure no. 20798 002 07010

Built
2009
16 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
160 ft
1 main span
Daily traffic
25,052
2022 count
Owner
State
State Highway Agency

About this bridge

I-84 (hwy 002) over Mosier Creek is a prestressed concrete stringer/multi-beam or girder carrying I-84 (hwy 002) over Mosier Creek in Wasco County, Oregon. It was built in 2009, so it is 16 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25,052 vehicles a day, roughly 24% of them trucks, projected to reach 30,400 by 2042. The structure is 160 ft (48.8 m) long and 94 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesI-84 (hwy 002)
CrossesMosier Creek
LocationIn Mosier
RouteInterstate 84
StateOregon
Coordinates45.68594, -121.39479
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70 US tons
Inventory rating53.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length160 ft (48.8 m)
Longest span160 ft (48.8 m)
Deck width94 ft (28.5 m)
Roadway width89 ft (27 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,052 (2022)
Projected traffic30,400 by 2042
Trucks24%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-84 (hwy 002) over Mosier Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is I-84 (hwy 002) over Mosier Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does I-84 (hwy 002) over Mosier Creek carry?

About 25,052 vehicles per day (2022 count), of which roughly 24% are trucks.

How long is I-84 (hwy 002) over Mosier Creek?

The structure is 160 ft (48.8 m) long with a longest span of 160 ft (48.8 m) and a deck 94 ft wide.

Who owns I-84 (hwy 002) over Mosier Creek?

It is owned by the State Highway Agency.