US Bridges

N Powder RD over I-84 (hwy 006)

Fair

Union County, Oregon · 076 MI NW Baker CO Line · Structure no. 13584 006C27864

Built
1974
51 years old
Condition
Fair
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
289 ft
2 main spans
Daily traffic
30
2022 count
Owner
State
State Highway Agency

About this bridge

N Powder RD over I-84 (hwy 006) is a prestressed concrete continuous box beam or girders - multiple carrying N Powder RD over I-84 (hwy 006) in Union County, Oregon. It was built in 1974, so it is 51 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 30 vehicles a day, roughly 36% of them trucks, projected to reach 156 by 2030. The structure is 289 ft (88.1 m) long and 34 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesN Powder RD
CrossesI-84 (hwy 006)
Location076 MI NW Baker CO Line
RouteInterstate 84
StateOregon
Coordinates45.12395, -117.96278
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.4 US tons
Inventory rating50.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length289 ft (88.1 m)
Longest span145 ft (44.2 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2022)
Projected traffic156 by 2030
Trucks36%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was N Powder RD over I-84 (hwy 006) built?

It was built in 1974, making it 51 years old in 2025.

What condition is N Powder RD over I-84 (hwy 006) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does N Powder RD over I-84 (hwy 006) carry?

About 30 vehicles per day (2022 count), of which roughly 36% are trucks.

How long is N Powder RD over I-84 (hwy 006)?

The structure is 289 ft (88.1 m) long with a longest span of 145 ft (44.2 m) and a deck 34 ft wide.

Who owns N Powder RD over I-84 (hwy 006)?

It is owned by the State Highway Agency.