US 30 (hwy 066) over North Powder River
FairUnion County, Oregon · Union-Baker Co. Line · Structure no. 07293 066 03286
- Built
- 1952
- 73 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 81 ft
- 3 main spans
- Daily traffic
- 872
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US 30 (hwy 066) over North Powder River is a concrete continuous stringer/multi-beam or girder carrying US 30 (hwy 066) over North Powder River in Union County, Oregon. It was built in 1952, so it is 73 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 872 vehicles a day, roughly 25% of them trucks, projected to reach 880 by 2042. The structure is 81 ft (24.7 m) long and 50 ft wide. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 30 (hwy 066) over North Powder River built?
It was built in 1952, making it 73 years old in 2025.
What condition is US 30 (hwy 066) over North Powder River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does US 30 (hwy 066) over North Powder River carry?
About 872 vehicles per day (2022 count), of which roughly 25% are trucks.
How long is US 30 (hwy 066) over North Powder River?
The structure is 81 ft (24.7 m) long with a longest span of 30 ft (9.1 m) and a deck 50 ft wide.
Who owns US 30 (hwy 066) over North Powder River?
It is owned by the State Highway Agency.