Echo Meadows Road over Hunt Ditch
FairUmatilla County, Oregon · 0.4 MI N of HWY 320 · Structure no. 59C320134700171
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 37 ft
- 1 main span
- Daily traffic
- 162
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Echo Meadows Road over Hunt Ditch is a steel stringer/multi-beam or girder carrying Echo Meadows Road over Hunt Ditch in Umatilla County, Oregon. It was built in 1962, so it is 63 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 162 vehicles a day, roughly 20% of them trucks, projected to reach 188 by 2025. The structure is 37 ft (11.3 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Echo Meadows Road over Hunt Ditch built?
It was built in 1962, making it 63 years old in 2025.
What condition is Echo Meadows Road over Hunt Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Echo Meadows Road over Hunt Ditch carry?
About 162 vehicles per day (2020 count), of which roughly 20% are trucks.
How long is Echo Meadows Road over Hunt Ditch?
The structure is 37 ft (11.3 m) long with a longest span of 35 ft (10.7 m) and a deck 25 ft wide.
Who owns Echo Meadows Road over Hunt Ditch?
It is owned by the County Highway Agency.