North Ash Road over Stage Gulch Ditch
FairPosted for loadUmatilla County, Oregon · Int With N Loop RD · Structure no. 59C195118100001
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 41 ft
- 1 main span
- Daily traffic
- 112
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
North Ash Road over Stage Gulch Ditch is a steel stringer/multi-beam or girder carrying North Ash Road over Stage Gulch Ditch in Umatilla County, Oregon. It was built in 1986, so it is 39 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 112 vehicles a day, roughly 20% of them trucks, projected to reach 132 by 2025. The structure is 41 ft (12.5 m) long and 22 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Ash Road over Stage Gulch Ditch built?
It was built in 1986, making it 39 years old in 2025.
What condition is North Ash Road over Stage Gulch Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does North Ash Road over Stage Gulch Ditch carry?
About 112 vehicles per day (2020 count), of which roughly 20% are trucks.
How long is North Ash Road over Stage Gulch Ditch?
The structure is 41 ft (12.5 m) long with a longest span of 40 ft (12.2 m) and a deck 22 ft wide.
Who owns North Ash Road over Stage Gulch Ditch?
It is owned by the County Highway Agency.