Access for Simplot over Umatilla Project Phase I
GoodUmatilla County, Oregon · Canal Sta No 100+96.63 · Structure no. 17PIE0008
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected February 2024
- Type
- Slab
- Concrete Continuous
- Length
- 29 ft
- 2 main spans
- Daily traffic
- 50
- 2024 count
- Owner
- Federal
- Bureau of Reclamation
About this bridge
Access for Simplot over Umatilla Project Phase I is a concrete continuous slab carrying Access for Simplot over Umatilla Project Phase I in Umatilla County, Oregon. It was built in 1993, so it is 32 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, roughly 90% of them trucks, projected to reach 50 by 2044. The structure is 29 ft (8.8 m) long and 27 ft wide. If it were closed, the detour would be 198.8 mi (320 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Access for Simplot over Umatilla Project Phase I built?
It was built in 1993, making it 32 years old in 2025.
What condition is Access for Simplot over Umatilla Project Phase I in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Access for Simplot over Umatilla Project Phase I carry?
About 50 vehicles per day (2024 count), of which roughly 90% are trucks.
How long is Access for Simplot over Umatilla Project Phase I?
The structure is 29 ft (8.8 m) long with a longest span of 11 ft (3.3 m) and a deck 27 ft wide.
Who owns Access for Simplot over Umatilla Project Phase I?
It is owned by the Bureau of Reclamation.