US Bridges

Or 11 (hwy 008) over UPRR & Frazer Ave

Fair

Umatilla County, Oregon · 00.6 MI N JCT FAI-84 · Structure no. 09535 008X00093

Built
1970
55 years old
Condition
Fair
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
671 ft
5 main spans
Daily traffic
6,150
2022 count
Owner
State
State Highway Agency

About this bridge

Or 11 (hwy 008) over UPRR & Frazer Ave is a prestressed concrete continuous box beam or girders - multiple carrying Or 11 (hwy 008) over UPRR & Frazer Ave in Umatilla County, Oregon. It was built in 1970, so it is 55 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,150 vehicles a day, roughly 12% of them trucks, projected to reach 6,300 by 2042. The structure is 671 ft (204.4 m) long and 61 ft wide.

CarriesOr 11 (hwy 008)
CrossesUPRR & Frazer Ave
Location00.6 MI N JCT FAI-84
RouteState Highway 11
StateOregon
Coordinates45.67133, -118.7797
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.1 US tons
Inventory rating32.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans5 (+1 approach)
Design loadHS 20
Structure length671 ft (204.4 m)
Longest span175 ft (53.3 m)
Deck width61 ft (18.7 m)
Roadway width58 ft (17.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,150 (2022)
Projected traffic6,300 by 2042
Trucks12%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Or 11 (hwy 008) over UPRR & Frazer Ave built?

It was built in 1970, making it 55 years old in 2025.

What condition is Or 11 (hwy 008) over UPRR & Frazer Ave in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Or 11 (hwy 008) over UPRR & Frazer Ave carry?

About 6,150 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is Or 11 (hwy 008) over UPRR & Frazer Ave?

The structure is 671 ft (204.4 m) long with a longest span of 175 ft (53.3 m) and a deck 61 ft wide.

Who owns Or 11 (hwy 008) over UPRR & Frazer Ave?

It is owned by the State Highway Agency.