US 730 (hwy 2) over UPRR (juniper Pt Tunnel)
FairUmatilla County, Oregon · 5.7 MI W Washington ST LN · Structure no. 07369 002 19762
- Built
- 1951
- 74 years old
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Concrete
- Length
- 130 ft
- 1 main span
- Daily traffic
- 3,403
- 2022 count
- Owner
- Railroad
- Railroad
About this bridge
US 730 (hwy 2) over UPRR (juniper Pt Tunnel) is a concrete slab carrying US 730 (hwy 2) over UPRR (juniper Pt Tunnel) in Umatilla County, Oregon. It was built in 1951, so it is 74 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,403 vehicles a day, roughly 50% of them trucks, projected to reach 4,200 by 2042. The structure is 130 ft (39.6 m) long and 32 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 730 (hwy 2) over UPRR (juniper Pt Tunnel) built?
It was built in 1951, making it 74 years old in 2025.
What condition is US 730 (hwy 2) over UPRR (juniper Pt Tunnel) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does US 730 (hwy 2) over UPRR (juniper Pt Tunnel) carry?
About 3,403 vehicles per day (2022 count), of which roughly 50% are trucks.
How long is US 730 (hwy 2) over UPRR (juniper Pt Tunnel)?
The structure is 130 ft (39.6 m) long with a longest span of 130 ft (39.6 m) and a deck 32 ft wide.
Who owns US 730 (hwy 2) over UPRR (juniper Pt Tunnel)?
It is owned by the Railroad.