US 395 (hwy 054) over UPRR
FairPosted for loadUmatilla County, Oregon · 6.1 Mi. North Jct. I-84 · Structure no. 07367A054 00684
- Built
- 1951
- 74 years old, rebuilt 1985
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 135 ft
- 3 main spans
- Daily traffic
- 7,968
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US 395 (hwy 054) over UPRR is a prestressed concrete stringer/multi-beam or girder carrying US 395 (hwy 054) over UPRR in Umatilla County, Oregon. It was built in 1951 and reconstructed in 1985, so it is 74 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 7,968 vehicles a day, roughly 17% of them trucks, projected to reach 8,600 by 2042. The structure is 135 ft (41.1 m) long and 85 ft wide. If it were closed, the detour would be 7.5 mi (12 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 395 (hwy 054) over UPRR built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1985.
What condition is US 395 (hwy 054) over UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does US 395 (hwy 054) over UPRR carry?
About 7,968 vehicles per day (2022 count), of which roughly 17% are trucks.
How long is US 395 (hwy 054) over UPRR?
The structure is 135 ft (41.1 m) long with a longest span of 45 ft (13.7 m) and a deck 85 ft wide.
Who owns US 395 (hwy 054) over UPRR?
It is owned by the State Highway Agency.