Road over South Fork Umatilla
FairUmatilla County, Oregon · FSR 32 near Cg · Structure no. 061406000001009
- Built
- 1954
- 71 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 84 ft
- 2 main spans
- Daily traffic
- 46
- 1989 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
Road over South Fork Umatilla is a wood or timber stringer/multi-beam or girder carrying Road over South Fork Umatilla in Umatilla County, Oregon. It was built in 1954, so it is 71 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 46 vehicles a day, projected to reach 69 by 2045. The structure is 84 ft (25.5 m) long and 16 ft wide. If it were closed, the detour would be 620.7 mi (999 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Road over South Fork Umatilla built?
It was built in 1954, making it 71 years old in 2025.
What condition is Road over South Fork Umatilla in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Road over South Fork Umatilla carry?
About 46 vehicles per day (1989 count).
How long is Road over South Fork Umatilla?
The structure is 84 ft (25.5 m) long with a longest span of 39 ft (12 m) and a deck 16 ft wide.
Who owns Road over South Fork Umatilla?
It is owned by the U.S. Forest Service.