I-84 (hwy 002) FR over Spanish Hollow Creek
FairSherman County, Oregon · In Biggs · Structure no. 02133 002F10475
- Built
- 1936
- 89 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 404 ft
- 7 main spans
- Daily traffic
- 2,663
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-84 (hwy 002) FR over Spanish Hollow Creek is a concrete continuous stringer/multi-beam or girder carrying I-84 (hwy 002) FR over Spanish Hollow Creek in Sherman County, Oregon. It was built in 1936, so it is 89 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,663 vehicles a day, roughly 33% of them trucks, projected to reach 2,100 by 2030. The structure is 404 ft (123.1 m) long and 35 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-84 (hwy 002) FR over Spanish Hollow Creek built?
It was built in 1936, making it 89 years old in 2025.
What condition is I-84 (hwy 002) FR over Spanish Hollow Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does I-84 (hwy 002) FR over Spanish Hollow Creek carry?
About 2,663 vehicles per day (2022 count), of which roughly 33% are trucks.
How long is I-84 (hwy 002) FR over Spanish Hollow Creek?
The structure is 404 ft (123.1 m) long with a longest span of 70 ft (21.3 m) and a deck 35 ft wide.
Who owns I-84 (hwy 002) FR over Spanish Hollow Creek?
It is owned by the State Highway Agency.