SE Tacoma ST over B-88 X Filled Streambed
GoodMultnomah County, Oregon · SE Tacoma near Golf Crse · Structure no. 51C02 000 00001
- Built
- 1915
- 110 years old
- Condition
- Good
- inspected August 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 48 ft
- 4 main spans
- Daily traffic
- 567
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
SE Tacoma ST over B-88 X Filled Streambed is a concrete continuous tee beam carrying SE Tacoma ST over B-88 X Filled Streambed in Multnomah County, Oregon. It was built in 1915, so it is 110 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 567 vehicles a day, roughly 1% of them trucks, projected to reach 626 by 2025. The structure is 48 ft (14.6 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SE Tacoma ST over B-88 X Filled Streambed built?
It was built in 1915, making it 110 years old in 2025.
What condition is SE Tacoma ST over B-88 X Filled Streambed in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SE Tacoma ST over B-88 X Filled Streambed carry?
About 567 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is SE Tacoma ST over B-88 X Filled Streambed?
The structure is 48 ft (14.6 m) long with a longest span of 23 ft (7 m) and a deck 27 ft wide.
Who owns SE Tacoma ST over B-88 X Filled Streambed?
It is owned by the City or Municipal Highway Agency.