SW Greenway Ave. over B-42 over SW Talbot RD
FairMultnomah County, Oregon · 5 Blocks S. of Patton Rd. · Structure no. 25B42 000 00030
- Built
- 1926
- 99 years old, rebuilt 1949
- Condition
- Fair
- inspected September 2024
- Type
- Tee Beam
- Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 4,371
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
SW Greenway Ave. over B-42 over SW Talbot RD is a concrete tee beam carrying SW Greenway Ave. over B-42 over SW Talbot RD in Multnomah County, Oregon. It was built in 1926 and reconstructed in 1949, so it is 99 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,371 vehicles a day, roughly 1% of them trucks, projected to reach 4,561 by 2025. The structure is 34 ft (10.4 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SW Greenway Ave. over B-42 over SW Talbot RD built?
It was built in 1926, making it 99 years old in 2025. It was reconstructed in 1949.
What condition is SW Greenway Ave. over B-42 over SW Talbot RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SW Greenway Ave. over B-42 over SW Talbot RD carry?
About 4,371 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is SW Greenway Ave. over B-42 over SW Talbot RD?
The structure is 34 ft (10.4 m) long with a longest span of 28 ft (8.5 m) and a deck 34 ft wide.
Who owns SW Greenway Ave. over B-42 over SW Talbot RD?
It is owned by the City or Municipal Highway Agency.