SW Osage ST over B-35 Semi-Viaduct
FairPosted for loadMultnomah County, Oregon · W of SW Vista Ave · Structure no. 25B35 000
- Built
- 1930
- 95 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 175 ft
- 12 main spans
- Daily traffic
- 107
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
SW Osage ST over B-35 Semi-Viaduct is a concrete continuous stringer/multi-beam or girder carrying SW Osage ST over B-35 Semi-Viaduct in Multnomah County, Oregon. It was built in 1930, so it is 95 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 107 vehicles a day, roughly 1% of them trucks, projected to reach 118 by 2025. The structure is 175 ft (53.3 m) long and 9 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SW Osage ST over B-35 Semi-Viaduct built?
It was built in 1930, making it 95 years old in 2025.
What condition is SW Osage ST over B-35 Semi-Viaduct in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SW Osage ST over B-35 Semi-Viaduct carry?
About 107 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is SW Osage ST over B-35 Semi-Viaduct?
The structure is 175 ft (53.3 m) long with a longest span of 15 ft (4.6 m) and a deck 9 ft wide.
Who owns SW Osage ST over B-35 Semi-Viaduct?
It is owned by the City or Municipal Highway Agency.