US Bridges

NE Claremont ST over B-5 X Woodlawn Park Path

Fair

Multnomah County, Oregon · Woodlawn Park-Ne 8th Ave · Structure no. 25B05 000 00000

Built
1974
51 years old
Condition
Fair
inspected July 2024
Type
Slab
Prestressed Concrete
Length
83 ft
4 main spans
Daily traffic
674
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

NE Claremont ST over B-5 X Woodlawn Park Path is a prestressed concrete slab carrying NE Claremont ST over B-5 X Woodlawn Park Path in Multnomah County, Oregon. It was built in 1974, so it is 51 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 674 vehicles a day, roughly 10% of them trucks, projected to reach 744 by 2025. The structure is 83 ft (25.3 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNE Claremont ST
CrossesB-5 X Woodlawn Park Path
LocationWoodlawn Park-Ne 8th Ave
RouteCity Street C0000
StateOregon
Coordinates45.57291, -122.65336
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating40.3 US tons
Inventory rating31.1 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length83 ft (25.3 m)
Longest span24 ft (7.3 m)
Deck width28 ft (8.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic674 (2020)
Projected traffic744 by 2025
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NE Claremont ST over B-5 X Woodlawn Park Path built?

It was built in 1974, making it 51 years old in 2025.

What condition is NE Claremont ST over B-5 X Woodlawn Park Path in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does NE Claremont ST over B-5 X Woodlawn Park Path carry?

About 674 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is NE Claremont ST over B-5 X Woodlawn Park Path?

The structure is 83 ft (25.3 m) long with a longest span of 24 ft (7.3 m) and a deck 28 ft wide.

Who owns NE Claremont ST over B-5 X Woodlawn Park Path?

It is owned by the City or Municipal Highway Agency.