US Bridges

HWY 002 over Oxng Marine DR

Fair

Multnomah County, Oregon · 0.8 MI W Sandy River · Structure no. 21816002BM_0169

Built
2015
10 years old
Condition
Fair
inspected April 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
130 ft
1 main span
Daily traffic
12,487
2022 count
Owner
State
State Highway Agency

About this bridge

HWY 002 over Oxng Marine DR is a prestressed concrete box beam or girders - single or spread carrying HWY 002 over Oxng Marine DR in Multnomah County, Oregon. It was built in 2015, so it is 10 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,487 vehicles a day, roughly 18% of them trucks, projected to reach 16,400 by 2042. The structure is 130 ft (39.6 m) long and 103 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesHWY 002
CrossesOxng Marine DR
Location0.8 MI W Sandy River
RouteInterstate 84
StateOregon
Coordinates45.54468, -122.40047
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.3 US tons
Inventory rating26.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length130 ft (39.6 m)
Longest span130 ft (39.6 m)
Deck width103 ft (31.5 m)
Roadway width98 ft (29.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,487 (2022)
Projected traffic16,400 by 2042
Trucks18%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY 002 over Oxng Marine DR built?

It was built in 2015, making it 10 years old in 2025.

What condition is HWY 002 over Oxng Marine DR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does HWY 002 over Oxng Marine DR carry?

About 12,487 vehicles per day (2022 count), of which roughly 18% are trucks.

How long is HWY 002 over Oxng Marine DR?

The structure is 130 ft (39.6 m) long with a longest span of 130 ft (39.6 m) and a deck 103 ft wide.

Who owns HWY 002 over Oxng Marine DR?

It is owned by the State Highway Agency.