1W to HWY 1 NB over SW Terwilliger Blvd.
FairMultnomah County, Oregon · 1.7 M S of Ross Isl. Br. · Structure no. 17064 001C29705
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 870 ft
- 6 main spans
- Daily traffic
- 9,194
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
1W to HWY 1 NB over SW Terwilliger Blvd. is a prestressed concrete continuous box beam or girders - multiple carrying 1W to HWY 1 NB over SW Terwilliger Blvd. in Multnomah County, Oregon. It was built in 1993, so it is 32 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,194 vehicles a day, roughly 1% of them trucks, projected to reach 25,500 by 2036. The structure is 870 ft (265.2 m) long and 29 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 1W to HWY 1 NB over SW Terwilliger Blvd. built?
It was built in 1993, making it 32 years old in 2025.
What condition is 1W to HWY 1 NB over SW Terwilliger Blvd. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does 1W to HWY 1 NB over SW Terwilliger Blvd. carry?
About 9,194 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is 1W to HWY 1 NB over SW Terwilliger Blvd.?
The structure is 870 ft (265.2 m) long with a longest span of 166 ft (50.6 m) and a deck 29 ft wide.
Who owns 1W to HWY 1 NB over SW Terwilliger Blvd.?
It is owned by the State Highway Agency.