HWY 064 (I-205) over Columbia R./So. Channel
FairMultnomah County, Oregon · 1.25 MI S Ore-Wash Line · Structure no. 16188 064 02525
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 3,115 ft
- 17 main spans
- Daily traffic
- 148,936
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY 064 (I-205) over Columbia R./So. Channel is a prestressed concrete box beam or girders - multiple carrying HWY 064 (I-205) over Columbia R./So. Channel in Multnomah County, Oregon. It was built in 1982, so it is 43 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 148,936 vehicles a day, roughly 6% of them trucks, projected to reach 203,600 by 2042. The structure is 3,115 ft (949.5 m) long and 136 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY 064 (I-205) over Columbia R./So. Channel built?
It was built in 1982, making it 43 years old in 2025.
What condition is HWY 064 (I-205) over Columbia R./So. Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does HWY 064 (I-205) over Columbia R./So. Channel carry?
About 148,936 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is HWY 064 (I-205) over Columbia R./So. Channel?
The structure is 3,115 ft (949.5 m) long with a longest span of 200 ft (61 m) and a deck 136 ft wide.
Who owns HWY 064 (I-205) over Columbia R./So. Channel?
It is owned by the State Highway Agency.