HWY 064 (I-205 Sb) over Columbia Sl & Alderwood
FairMultnomah County, Oregon · 2.2 MI S Ore-Wash Line · Structure no. 16055A064 02433
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 311 ft
- 3 main spans
- Daily traffic
- 74,468
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY 064 (I-205 Sb) over Columbia Sl & Alderwood is a prestressed concrete stringer/multi-beam or girder carrying HWY 064 (I-205 Sb) over Columbia Sl & Alderwood in Multnomah County, Oregon. It was built in 1980, so it is 45 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 74,468 vehicles a day, roughly 6% of them trucks, projected to reach 101,800 by 2042. The structure is 311 ft (94.8 m) long and 70 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY 064 (I-205 Sb) over Columbia Sl & Alderwood built?
It was built in 1980, making it 45 years old in 2025.
What condition is HWY 064 (I-205 Sb) over Columbia Sl & Alderwood in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does HWY 064 (I-205 Sb) over Columbia Sl & Alderwood carry?
About 74,468 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is HWY 064 (I-205 Sb) over Columbia Sl & Alderwood?
The structure is 311 ft (94.8 m) long with a longest span of 120 ft (36.6 m) and a deck 70 ft wide.
Who owns HWY 064 (I-205 Sb) over Columbia Sl & Alderwood?
It is owned by the State Highway Agency.