US Bridges

HWY 064 over Harold ST

Fair

Multnomah County, Oregon · 7.4 MI N Clackamas River · Structure no. 13537 064 01811

Built
1978
47 years old
Condition
Fair
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
110 ft
1 main span
Daily traffic
151,700
2022 count
Owner
State
State Highway Agency

About this bridge

HWY 064 over Harold ST is a prestressed concrete box beam or girders - multiple carrying HWY 064 over Harold ST in Multnomah County, Oregon. It was built in 1978, so it is 47 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 151,700 vehicles a day, roughly 8% of them trucks, projected to reach 167,300 by 2042. The structure is 110 ft (33.5 m) long and 162 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesHWY 064
CrossesHarold ST
Location7.4 MI N Clackamas River
RouteInterstate 205
StateOregon
Coordinates45.48275, -122.56598
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.5 US tons
Inventory rating48.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length110 ft (33.5 m)
Longest span110 ft (33.5 m)
Deck width162 ft (49.4 m)
Roadway width156 ft (47.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic151,700 (2022)
Projected traffic167,300 by 2042
Trucks8%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY 064 over Harold ST built?

It was built in 1978, making it 47 years old in 2025.

What condition is HWY 064 over Harold ST in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does HWY 064 over Harold ST carry?

About 151,700 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is HWY 064 over Harold ST?

The structure is 110 ft (33.5 m) long with a longest span of 110 ft (33.5 m) and a deck 162 ft wide.

Who owns HWY 064 over Harold ST?

It is owned by the State Highway Agency.