I-5 (hwy 001) over Elliot School Viaduct
FairMultnomah County, Oregon · 1.2 MI N of Burnside Br · Structure no. 08782A001 30265
- Built
- 1963
- 62 years old, rebuilt 1985
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 505 ft
- 6 main spans
- Daily traffic
- 110,680
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-5 (hwy 001) over Elliot School Viaduct is a prestressed concrete stringer/multi-beam or girder carrying I-5 (hwy 001) over Elliot School Viaduct in Multnomah County, Oregon. It was built in 1963 and reconstructed in 1985, so it is 62 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 110,680 vehicles a day, roughly 8% of them trucks, projected to reach 116,200 by 2042. The structure is 505 ft (153.9 m) long and 113 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-5 (hwy 001) over Elliot School Viaduct built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1985.
What condition is I-5 (hwy 001) over Elliot School Viaduct in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does I-5 (hwy 001) over Elliot School Viaduct carry?
About 110,680 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is I-5 (hwy 001) over Elliot School Viaduct?
The structure is 505 ft (153.9 m) long with a longest span of 68 ft (20.7 m) and a deck 113 ft wide.
Who owns I-5 (hwy 001) over Elliot School Viaduct?
It is owned by the State Highway Agency.