US Bridges

I-5 (hwy 001) NB over Marquam Bridge Ramp

Fair

Multnomah County, Oregon · 0.8 MI S of Burnside Br · Structure no. 08590D001 30068

Built
1966
59 years old, rebuilt 1994
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
2,318 ft
13 main spans
Daily traffic
42,700
2022 count
Owner
State
State Highway Agency

About this bridge

I-5 (hwy 001) NB over Marquam Bridge Ramp is a steel stringer/multi-beam or girder carrying I-5 (hwy 001) NB over Marquam Bridge Ramp in Multnomah County, Oregon. It was built in 1966 and reconstructed in 1994, so it is 59 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 42,700 vehicles a day, roughly 10% of them trucks, projected to reach 45,300 by 2042. The structure is 2,318 ft (706.6 m) long and 50 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesI-5 (hwy 001) NB
CrossesMarquam Bridge Ramp
Location0.8 MI S of Burnside Br
RouteInterstate 5
StateOregon
Coordinates45.51242, -122.6676
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating15.8 US tons
Inventory rating12.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans13 (+9 approach)
Design loadHS 20
Structure length2,318 ft (706.6 m)
Longest span178 ft (54.4 m)
Deck width50 ft (15.2 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic42,700 (2022)
Projected traffic45,300 by 2042
Trucks10%
Lanes on structure3
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway and waterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$24 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-5 (hwy 001) NB over Marquam Bridge Ramp built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1994.

What condition is I-5 (hwy 001) NB over Marquam Bridge Ramp in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does I-5 (hwy 001) NB over Marquam Bridge Ramp carry?

About 42,700 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is I-5 (hwy 001) NB over Marquam Bridge Ramp?

The structure is 2,318 ft (706.6 m) long with a longest span of 178 ft (54.4 m) and a deck 50 ft wide.

Who owns I-5 (hwy 001) NB over Marquam Bridge Ramp?

It is owned by the State Highway Agency.