Or 99W/HOLLADAY Rp over B-146 Steel Br Rp X UPRR
FairPosted for loadMultnomah County, Oregon · NE End of Steel Bridge · Structure no. 06683D01WX00044
- Built
- 1952
- 73 years old, rebuilt 1985
- Condition
- Fair
- inspected June 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 318 ft
- 6 main spans
- Daily traffic
- 8,742
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Or 99W/HOLLADAY Rp over B-146 Steel Br Rp X UPRR is a concrete continuous tee beam carrying Or 99W/HOLLADAY Rp over B-146 Steel Br Rp X UPRR in Multnomah County, Oregon. It was built in 1952 and reconstructed in 1985, so it is 73 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 8,742 vehicles a day, roughly 7% of them trucks, projected to reach 12,448 by 2025. The structure is 318 ft (96.9 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Or 99W/HOLLADAY Rp over B-146 Steel Br Rp X UPRR built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1985.
What condition is Or 99W/HOLLADAY Rp over B-146 Steel Br Rp X UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Or 99W/HOLLADAY Rp over B-146 Steel Br Rp X UPRR carry?
About 8,742 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Or 99W/HOLLADAY Rp over B-146 Steel Br Rp X UPRR?
The structure is 318 ft (96.9 m) long with a longest span of 101 ft (30.8 m) and a deck 40 ft wide.
Who owns Or 99W/HOLLADAY Rp over B-146 Steel Br Rp X UPRR?
It is owned by the City or Municipal Highway Agency.