HWY 001 (I-5) over Jantzen Ped Tunnel
FairMultnomah County, Oregon · 0.5 MI S of Interstate Br · Structure no. 04516A001 30793
- Built
- 1916
- 109 years old
- Condition
- Fair
- inspected December 2024
- Type
- Tee Beam
- Concrete
- Length
- 29 ft
- 1 main span
- Daily traffic
- 130,027
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY 001 (I-5) over Jantzen Ped Tunnel is a concrete tee beam carrying HWY 001 (I-5) over Jantzen Ped Tunnel in Multnomah County, Oregon. It was built in 1916, so it is 109 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: open, would be posted or closed except for temporary shoring.
It carries about 130,027 vehicles a day, roughly 9% of them trucks, projected to reach 131,200 by 2042. The structure is 29 ft (8.8 m) long and 239 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY 001 (I-5) over Jantzen Ped Tunnel built?
It was built in 1916, making it 109 years old in 2025.
What condition is HWY 001 (I-5) over Jantzen Ped Tunnel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does HWY 001 (I-5) over Jantzen Ped Tunnel carry?
About 130,027 vehicles per day (2022 count), of which roughly 9% are trucks.
How long is HWY 001 (I-5) over Jantzen Ped Tunnel?
The structure is 29 ft (8.8 m) long with a longest span of 29 ft (8.8 m) and a deck 239 ft wide.
Who owns HWY 001 (I-5) over Jantzen Ped Tunnel?
It is owned by the State Highway Agency.