US Bridges

HWY 092 over Partial Viaduct

Good

Multnomah County, Oregon · 3.8 MI W of ST Johns Br · Structure no. 02641A02W 01077

Built
1949
76 years old, rebuilt 1969
Condition
Good
inspected October 2023
Type
Slab
Concrete Continuous
Length
427 ft
1 main span
Daily traffic
10,062
2022 count
Owner
State
State Highway Agency

About this bridge

HWY 092 over Partial Viaduct is a concrete continuous slab carrying HWY 092 over Partial Viaduct in Multnomah County, Oregon. It was built in 1949 and reconstructed in 1969, so it is 76 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,062 vehicles a day, roughly 8% of them trucks, projected to reach 12,800 by 2042. The structure is 427 ft (130.2 m) long and 8 ft wide.

CarriesHWY 092
CrossesPartial Viaduct
Location3.8 MI W of ST Johns Br
RouteU.S. Route 30
StateOregon
Coordinates45.62668, -122.81861
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating22.8 US tons
Inventory rating17.9 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length427 ft (130.2 m)
Longest span30 ft (9.1 m)
Deck width8 ft (2.4 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,062 (2022)
Projected traffic12,800 by 2042
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY 092 over Partial Viaduct built?

It was built in 1949, making it 76 years old in 2025. It was reconstructed in 1969.

What condition is HWY 092 over Partial Viaduct in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does HWY 092 over Partial Viaduct carry?

About 10,062 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is HWY 092 over Partial Viaduct?

The structure is 427 ft (130.2 m) long with a longest span of 30 ft (9.1 m) and a deck 8 ft wide.

Who owns HWY 092 over Partial Viaduct?

It is owned by the State Highway Agency.