Or 213 (ne 82nd) over UPRR and Trimet
FairPosted for loadMultnomah County, Oregon · 5.0 MI E of Port Center · Structure no. 01994 068 00224
- Built
- 1934
- 91 years old, rebuilt 1954
- Condition
- Fair
- inspected June 2023
- Type
- Slab
- Concrete Continuous
- Length
- 116 ft
- 5 main spans
- Daily traffic
- 9,504
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Or 213 (ne 82nd) over UPRR and Trimet is a concrete continuous slab carrying Or 213 (ne 82nd) over UPRR and Trimet in Multnomah County, Oregon. It was built in 1934 and reconstructed in 1954, so it is 91 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 9,504 vehicles a day, roughly 2% of them trucks, projected to reach 15,600 by 2042. The structure is 116 ft (35.4 m) long and 117 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Or 213 (ne 82nd) over UPRR and Trimet built?
It was built in 1934, making it 91 years old in 2025. It was reconstructed in 1954.
What condition is Or 213 (ne 82nd) over UPRR and Trimet in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Or 213 (ne 82nd) over UPRR and Trimet carry?
About 9,504 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is Or 213 (ne 82nd) over UPRR and Trimet?
The structure is 116 ft (35.4 m) long with a longest span of 31 ft (9.4 m) and a deck 117 ft wide.
Who owns Or 213 (ne 82nd) over UPRR and Trimet?
It is owned by the State Highway Agency.