US Bridges

Division Street over Canal #2

Fair

Morrow County, Oregon · 0.8 MI South of HWY 730 · Structure no. 49C07 011800000

Built
1973
52 years old, rebuilt 1985
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
26 ft
1 main span
Daily traffic
29
2014 count
Owner
County
County Highway Agency

About this bridge

Division Street over Canal #2 is a steel stringer/multi-beam or girder carrying Division Street over Canal #2 in Morrow County, Oregon. It was built in 1973 and reconstructed in 1985, so it is 52 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 29 vehicles a day, roughly 1% of them trucks, projected to reach 91 by 2030. The structure is 26 ft (7.9 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesDivision Street
CrossesCanal #2
Location0.8 MI South of HWY 730
RouteCounty Highway 0
StateOregon
Coordinates45.88372, -119.49439
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.7 US tons
Inventory rating30.8 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span25 ft (7.6 m)
Deck width31 ft (9.5 m)
Roadway width31 ft (9.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29 (2014)
Projected traffic91 by 2030
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Division Street over Canal #2 built?

It was built in 1973, making it 52 years old in 2025. It was reconstructed in 1985.

What condition is Division Street over Canal #2 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Division Street over Canal #2 carry?

About 29 vehicles per day (2014 count), of which roughly 1% are trucks.

How long is Division Street over Canal #2?

The structure is 26 ft (7.9 m) long with a longest span of 25 ft (7.6 m) and a deck 31 ft wide.

Who owns Division Street over Canal #2?

It is owned by the County Highway Agency.