Division Street over Canal #2
FairMorrow County, Oregon · 0.8 MI South of HWY 730 · Structure no. 49C07 011800000
- Built
- 1973
- 52 years old, rebuilt 1985
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 26 ft
- 1 main span
- Daily traffic
- 29
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Division Street over Canal #2 is a steel stringer/multi-beam or girder carrying Division Street over Canal #2 in Morrow County, Oregon. It was built in 1973 and reconstructed in 1985, so it is 52 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 29 vehicles a day, roughly 1% of them trucks, projected to reach 91 by 2030. The structure is 26 ft (7.9 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Division Street over Canal #2 built?
It was built in 1973, making it 52 years old in 2025. It was reconstructed in 1985.
What condition is Division Street over Canal #2 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Division Street over Canal #2 carry?
About 29 vehicles per day (2014 count), of which roughly 1% are trucks.
How long is Division Street over Canal #2?
The structure is 26 ft (7.9 m) long with a longest span of 25 ft (7.6 m) and a deck 31 ft wide.
Who owns Division Street over Canal #2?
It is owned by the County Highway Agency.