US Bridges

Or 74 (hwy 052) over Reitman Canyon Creek

Fair

Morrow County, Oregon · In Ione · Structure no. 17431 052 02832

Built
1995
30 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete Continuous
Length
33 ft
2 main spans
Daily traffic
860
2022 count
Owner
State
State Highway Agency

About this bridge

Or 74 (hwy 052) over Reitman Canyon Creek is a concrete continuous culvert carrying Or 74 (hwy 052) over Reitman Canyon Creek in Morrow County, Oregon. It was built in 1995, so it is 30 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 860 vehicles a day, roughly 31% of them trucks, projected to reach 910 by 2042. The structure is 33 ft (10.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesOr 74 (hwy 052)
CrossesReitman Canyon Creek
LocationIn Ione
RouteState Highway 74
StateOregon
Coordinates45.5035, -119.8191
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.8 US tons
Inventory rating44 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length33 ft (10.1 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic860 (2022)
Projected traffic910 by 2042
Trucks31%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Or 74 (hwy 052) over Reitman Canyon Creek built?

It was built in 1995, making it 30 years old in 2025.

What condition is Or 74 (hwy 052) over Reitman Canyon Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Or 74 (hwy 052) over Reitman Canyon Creek carry?

About 860 vehicles per day (2022 count), of which roughly 31% are trucks.

How long is Or 74 (hwy 052) over Reitman Canyon Creek?

The structure is 33 ft (10.1 m) long with a longest span of 14 ft (4.3 m).

Who owns Or 74 (hwy 052) over Reitman Canyon Creek?

It is owned by the State Highway Agency.