Fuller Canyon RD over Willow Creek EB
FairPosted for loadMorrow County, Oregon · 0.06 MI W of HWY 74 · Structure no. 10958A061200000
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 40 ft
- 1 main span
- Daily traffic
- 416
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Fuller Canyon RD over Willow Creek EB is a wood or timber stringer/multi-beam or girder carrying Fuller Canyon RD over Willow Creek EB in Morrow County, Oregon. It was built in 1993, so it is 32 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 416 vehicles a day, roughly 39% of them trucks, projected to reach 486 by 2025. The structure is 40 ft (12.2 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fuller Canyon RD over Willow Creek EB built?
It was built in 1993, making it 32 years old in 2025.
What condition is Fuller Canyon RD over Willow Creek EB in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Fuller Canyon RD over Willow Creek EB carry?
About 416 vehicles per day (2020 count), of which roughly 39% are trucks.
How long is Fuller Canyon RD over Willow Creek EB?
The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 34 ft wide.
Who owns Fuller Canyon RD over Willow Creek EB?
It is owned by the County Highway Agency.