US Bridges

Fuller Canyon RD over Willow Creek EB

FairPosted for load

Morrow County, Oregon · 0.06 MI W of HWY 74 · Structure no. 10958A061200000

Built
1993
32 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
40 ft
1 main span
Daily traffic
416
2020 count
Owner
County
County Highway Agency

About this bridge

Fuller Canyon RD over Willow Creek EB is a wood or timber stringer/multi-beam or girder carrying Fuller Canyon RD over Willow Creek EB in Morrow County, Oregon. It was built in 1993, so it is 32 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 416 vehicles a day, roughly 39% of them trucks, projected to reach 486 by 2025. The structure is 40 ft (12.2 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFuller Canyon RD
CrossesWillow Creek EB
Location0.06 MI W of HWY 74
RouteCounty Highway 0
StateOregon
Coordinates45.3656, -119.5658
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating24.7 US tons
Inventory rating19 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadHS 20
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width34 ft (10.4 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic416 (2020)
Projected traffic486 by 2025
Trucks39%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fuller Canyon RD over Willow Creek EB built?

It was built in 1993, making it 32 years old in 2025.

What condition is Fuller Canyon RD over Willow Creek EB in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Fuller Canyon RD over Willow Creek EB carry?

About 416 vehicles per day (2020 count), of which roughly 39% are trucks.

How long is Fuller Canyon RD over Willow Creek EB?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 34 ft wide.

Who owns Fuller Canyon RD over Willow Creek EB?

It is owned by the County Highway Agency.