Main St. over HWY 2 164.16 Boardman Ic
FairMorrow County, Oregon · 14.7 MI E Gilliam CO LN · Structure no. 08946 002C16416
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected February 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 282 ft
- 4 main spans
- Daily traffic
- 558
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
Main St. over HWY 2 164.16 Boardman Ic is a concrete continuous tee beam carrying Main St. over HWY 2 164.16 Boardman Ic in Morrow County, Oregon. It was built in 1965, so it is 60 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 558 vehicles a day, roughly 20% of them trucks, projected to reach 1,093 by 2030. The structure is 282 ft (86 m) long and 42 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main St. over HWY 2 164.16 Boardman Ic built?
It was built in 1965, making it 60 years old in 2025.
What condition is Main St. over HWY 2 164.16 Boardman Ic in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Main St. over HWY 2 164.16 Boardman Ic carry?
About 558 vehicles per day (2010 count), of which roughly 20% are trucks.
How long is Main St. over HWY 2 164.16 Boardman Ic?
The structure is 282 ft (86 m) long with a longest span of 80 ft (24.4 m) and a deck 42 ft wide.
Who owns Main St. over HWY 2 164.16 Boardman Ic?
It is owned by the State Highway Agency.