Airport RD over Shelton Ditch
FairMarion County, Oregon · .25MI N. Mission ST · Structure no. 470445
- Built
- 1954
- 71 years old
- Condition
- Fair
- inspected August 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 85 ft
- 3 main spans
- Daily traffic
- 8,475
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Airport RD over Shelton Ditch is a concrete continuous tee beam carrying Airport RD over Shelton Ditch in Marion County, Oregon. It was built in 1954, so it is 71 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,475 vehicles a day, roughly 5% of them trucks, projected to reach 9,225 by 2025. The structure is 85 ft (25.9 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Airport RD over Shelton Ditch built?
It was built in 1954, making it 71 years old in 2025.
What condition is Airport RD over Shelton Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Airport RD over Shelton Ditch carry?
About 8,475 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is Airport RD over Shelton Ditch?
The structure is 85 ft (25.9 m) long with a longest span of 52 ft (15.9 m) and a deck 31 ft wide.
Who owns Airport RD over Shelton Ditch?
It is owned by the City or Municipal Highway Agency.