US Bridges

Or 22 (hwy 162) WB over Or 214 (hwy 163)

Good

Marion County, Oregon · 0.3 MI E HWY 163 JCT · Structure no. 17418 162 00667

Built
1997
28 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
202 ft
3 main spans
Daily traffic
12,431
2022 count
Owner
State
State Highway Agency

About this bridge

Or 22 (hwy 162) WB over Or 214 (hwy 163) is a prestressed concrete continuous stringer/multi-beam or girder carrying Or 22 (hwy 162) WB over Or 214 (hwy 163) in Marion County, Oregon. It was built in 1997, so it is 28 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,431 vehicles a day, roughly 4% of them trucks, projected to reach 15,150 by 2042. The structure is 202 ft (61.6 m) long and 45 ft wide.

CarriesOr 22 (hwy 162) WB
CrossesOr 214 (hwy 163)
Location0.3 MI E HWY 163 JCT
RouteState Highway 22
StateOregon
Coordinates44.87269, -122.90211
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.4 US tons
Inventory rating43.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length202 ft (61.6 m)
Longest span122 ft (37.2 m)
Deck width45 ft (13.6 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,431 (2022)
Projected traffic15,150 by 2042
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Or 22 (hwy 162) WB over Or 214 (hwy 163) built?

It was built in 1997, making it 28 years old in 2025.

What condition is Or 22 (hwy 162) WB over Or 214 (hwy 163) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Or 22 (hwy 162) WB over Or 214 (hwy 163) carry?

About 12,431 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Or 22 (hwy 162) WB over Or 214 (hwy 163)?

The structure is 202 ft (61.6 m) long with a longest span of 122 ft (37.2 m) and a deck 45 ft wide.

Who owns Or 22 (hwy 162) WB over Or 214 (hwy 163)?

It is owned by the State Highway Agency.