I-5 (hwy 1) SB over Santiam Overflow No. 3
FairMarion County, Oregon · 069 MI N of Albany Ncl · Structure no. 08122 001 24112
- Built
- 1958
- 67 years old, rebuilt 1991
- Condition
- Fair
- inspected February 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 108 ft
- 3 main spans
- Daily traffic
- 33,446
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-5 (hwy 1) SB over Santiam Overflow No. 3 is a concrete continuous tee beam carrying I-5 (hwy 1) SB over Santiam Overflow No. 3 in Marion County, Oregon. It was built in 1958 and reconstructed in 1991, so it is 67 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 33,446 vehicles a day, roughly 15% of them trucks, projected to reach 36,150 by 2042. The structure is 108 ft (32.9 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-5 (hwy 1) SB over Santiam Overflow No. 3 built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1991.
What condition is I-5 (hwy 1) SB over Santiam Overflow No. 3 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does I-5 (hwy 1) SB over Santiam Overflow No. 3 carry?
About 33,446 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is I-5 (hwy 1) SB over Santiam Overflow No. 3?
The structure is 108 ft (32.9 m) long with a longest span of 36 ft (11 m) and a deck 85 ft wide.
Who owns I-5 (hwy 1) SB over Santiam Overflow No. 3?
It is owned by the State Highway Agency.