HWY 72 (12th St) over Shelton Ditch
FairMarion County, Oregon · City of Salem · Structure no. 08111 072 00623
- Built
- 1929
- 96 years old, rebuilt 1956
- Condition
- Fair
- inspected October 2024
- Type
- Arch - Deck
- Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 17,817
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY 72 (12th St) over Shelton Ditch is a concrete arch - deck carrying HWY 72 (12th St) over Shelton Ditch in Marion County, Oregon. It was built in 1929 and reconstructed in 1956, so it is 96 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,817 vehicles a day, roughly 3% of them trucks, projected to reach 20,250 by 2042. The structure is 45 ft (13.7 m) long and 58 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY 72 (12th St) over Shelton Ditch built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 1956.
What condition is HWY 72 (12th St) over Shelton Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does HWY 72 (12th St) over Shelton Ditch carry?
About 17,817 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is HWY 72 (12th St) over Shelton Ditch?
The structure is 45 ft (13.7 m) long with a longest span of 45 ft (13.7 m) and a deck 58 ft wide.
Who owns HWY 72 (12th St) over Shelton Ditch?
It is owned by the State Highway Agency.