US Bridges

Or 22 (hwy 162) over Partial Viaduct

Fair

Marion County, Oregon · 100 MI E Mill City · Structure no. 07964 162 04033

Built
1947
78 years old
Condition
Fair
inspected August 2023
Type
Slab
Concrete Continuous
Length
442 ft
18 main spans
Daily traffic
4,907
2022 count
Owner
State
State Highway Agency

About this bridge

Or 22 (hwy 162) over Partial Viaduct is a concrete continuous slab carrying Or 22 (hwy 162) over Partial Viaduct in Marion County, Oregon. It was built in 1947, so it is 78 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,907 vehicles a day, roughly 17% of them trucks, projected to reach 6,300 by 2042. The structure is 442 ft (134.8 m) long and 36 ft wide. If it were closed, the detour would be 34.2 mi (55 km).

CarriesOr 22 (hwy 162)
CrossesPartial Viaduct
Location100 MI E Mill City
RouteState Highway 22
StateOregon
Coordinates44.74808, -122.27842
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating31 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans18
Design loadHS 15
Structure length442 ft (134.8 m)
Longest span25 ft (7.6 m)
Deck width36 ft (11 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,907 (2022)
Projected traffic6,300 by 2042
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed34.2 mi (55 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Or 22 (hwy 162) over Partial Viaduct built?

It was built in 1947, making it 78 years old in 2025.

What condition is Or 22 (hwy 162) over Partial Viaduct in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does Or 22 (hwy 162) over Partial Viaduct carry?

About 4,907 vehicles per day (2022 count), of which roughly 17% are trucks.

How long is Or 22 (hwy 162) over Partial Viaduct?

The structure is 442 ft (134.8 m) long with a longest span of 25 ft (7.6 m) and a deck 36 ft wide.

Who owns Or 22 (hwy 162) over Partial Viaduct?

It is owned by the State Highway Agency.