S. 1st Ave over Main Stayton Canal
FairMarion County, Oregon · In Stayton · Structure no. 05351A066 00025
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected August 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 108 ft
- 3 main spans
- Daily traffic
- 1,400
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
S. 1st Ave over Main Stayton Canal is a prestressed concrete slab carrying S. 1st Ave over Main Stayton Canal in Marion County, Oregon. It was built in 1965, so it is 60 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,400 vehicles a day, roughly 15% of them trucks, projected to reach 1,600 by 2038. The structure is 108 ft (32.9 m) long and 42 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S. 1st Ave over Main Stayton Canal built?
It was built in 1965, making it 60 years old in 2025.
What condition is S. 1st Ave over Main Stayton Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does S. 1st Ave over Main Stayton Canal carry?
About 1,400 vehicles per day (2018 count), of which roughly 15% are trucks.
How long is S. 1st Ave over Main Stayton Canal?
The structure is 108 ft (32.9 m) long with a longest span of 34 ft (10.4 m) and a deck 42 ft wide.
Who owns S. 1st Ave over Main Stayton Canal?
It is owned by the County Highway Agency.