Champoeg RD over Mission Creek
GoodPosted for loadMarion County, Oregon · 01.5 East of HWY 219 · Structure no. 05109 012 00000
- Built
- 1970
- 55 years old
- Condition
- Good
- inspected August 2024
- Type
- Slab
- Wood or Timber
- Length
- 33 ft
- 2 main spans
- Daily traffic
- 1,208
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Champoeg RD over Mission Creek is a wood or timber slab carrying Champoeg RD over Mission Creek in Marion County, Oregon. It was built in 1970, so it is 55 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 1,208 vehicles a day, roughly 26% of them trucks, projected to reach 1,300 by 2042. The structure is 33 ft (10.1 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Champoeg RD over Mission Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is Champoeg RD over Mission Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Champoeg RD over Mission Creek carry?
About 1,208 vehicles per day (2022 count), of which roughly 26% are trucks.
How long is Champoeg RD over Mission Creek?
The structure is 33 ft (10.1 m) long with a longest span of 16 ft (4.9 m) and a deck 27 ft wide.
Who owns Champoeg RD over Mission Creek?
It is owned by the County Highway Agency.