US Bridges

9th Ave W C-511 over Vale Main Canal

FairPosted for load

Malheur County, Oregon · 018MI W Inter HWY 26 · Structure no. 45C110051100111

Built
1973
52 years old
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
31 ft
1 main span
Daily traffic
6
2020 count
Owner
County
County Highway Agency

About this bridge

9th Ave W C-511 over Vale Main Canal is a steel stringer/multi-beam or girder carrying 9th Ave W C-511 over Vale Main Canal in Malheur County, Oregon. It was built in 1973, so it is 52 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 6 vehicles a day, roughly 10% of them trucks, projected to reach 7 by 2025. The structure is 31 ft (9.4 m) long and 14 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

Carries9th Ave W C-511
CrossesVale Main Canal
Location018MI W Inter HWY 26
RouteCounty Highway C0511
StateOregon
Coordinates44.11283, -117.40296
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating20 US tons
Inventory rating15.3 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadH 10
Structure length31 ft (9.4 m)
Longest span30 ft (9.1 m)
Deck width14 ft (4.3 m)
Roadway width12 ft (3.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6 (2020)
Projected traffic7 by 2025
Trucks10%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 9th Ave W C-511 over Vale Main Canal built?

It was built in 1973, making it 52 years old in 2025.

What condition is 9th Ave W C-511 over Vale Main Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does 9th Ave W C-511 over Vale Main Canal carry?

About 6 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is 9th Ave W C-511 over Vale Main Canal?

The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 14 ft wide.

Who owns 9th Ave W C-511 over Vale Main Canal?

It is owned by the County Highway Agency.