HARPER-WESTFALC805 over Vale Canal
GoodMalheur County, Oregon · 033 M NW Harper School · Structure no. 20282 080500832
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected September 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 104 ft
- 1 main span
- Daily traffic
- 181
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
HARPER-WESTFALC805 over Vale Canal is a prestressed concrete tee beam carrying HARPER-WESTFALC805 over Vale Canal in Malheur County, Oregon. It was built in 2005, so it is 20 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 181 vehicles a day, roughly 10% of them trucks, projected to reach 211 by 2025. The structure is 104 ft (31.7 m) long and 34 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HARPER-WESTFALC805 over Vale Canal built?
It was built in 2005, making it 20 years old in 2025.
What condition is HARPER-WESTFALC805 over Vale Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does HARPER-WESTFALC805 over Vale Canal carry?
About 181 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is HARPER-WESTFALC805 over Vale Canal?
The structure is 104 ft (31.7 m) long with a longest span of 101 ft (30.8 m) and a deck 34 ft wide.
Who owns HARPER-WESTFALC805 over Vale Canal?
It is owned by the County Highway Agency.