US Bridges

US 20 (hwy 007) over Gold Crk

Good

Malheur County, Oregon · 28.2 MI E Harney CO Line · Structure no. 19914 007 20842

Built
2004
21 years old
Condition
Good
inspected June 2023
Type
Slab
Prestressed Concrete
Length
71 ft
1 main span
Daily traffic
1,764
2022 count
Owner
State
State Highway Agency

About this bridge

US 20 (hwy 007) over Gold Crk is a prestressed concrete slab carrying US 20 (hwy 007) over Gold Crk in Malheur County, Oregon. It was built in 2004, so it is 21 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,764 vehicles a day, roughly 28% of them trucks, projected to reach 1,900 by 2042. The structure is 71 ft (21.6 m) long and 40 ft wide. If it were closed, the detour would be 69 mi (111 km).

CarriesUS 20 (hwy 007)
CrossesGold Crk
Location28.2 MI E Harney CO Line
RouteU.S. Route 20
StateOregon
Coordinates43.7753, -117.8044
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.2 US tons
Inventory rating36.4 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length71 ft (21.6 m)
Longest span71 ft (21.6 m)
Deck width40 ft (12.2 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,764 (2022)
Projected traffic1,900 by 2042
Trucks28%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed69 mi (111 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 20 (hwy 007) over Gold Crk built?

It was built in 2004, making it 21 years old in 2025.

What condition is US 20 (hwy 007) over Gold Crk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does US 20 (hwy 007) over Gold Crk carry?

About 1,764 vehicles per day (2022 count), of which roughly 28% are trucks.

How long is US 20 (hwy 007) over Gold Crk?

The structure is 71 ft (21.6 m) long with a longest span of 71 ft (21.6 m) and a deck 40 ft wide.

Who owns US 20 (hwy 007) over Gold Crk?

It is owned by the State Highway Agency.