US Bridges

Succor B483GREELEY over Carter CR

Fair

Malheur County, Oregon · 083 N JCT US HWY 95 · Structure no. 15747A068700845

Built
1988
37 years old
Condition
Fair
inspected September 2023
Type
Slab
Prestressed Concrete
Length
37 ft
1 main span
Daily traffic
156
2020 count
Owner
County
County Highway Agency

About this bridge

Succor B483GREELEY over Carter CR is a prestressed concrete slab carrying Succor B483GREELEY over Carter CR in Malheur County, Oregon. It was built in 1988, so it is 37 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 156 vehicles a day, roughly 10% of them trucks, projected to reach 181 by 2025. The structure is 37 ft (11.3 m) long and 24 ft wide. If it were closed, the detour would be 49.7 mi (80 km).

CarriesSuccor B483GREELEY
CrossesCarter CR
Location083 N JCT US HWY 95
RouteCounty Highway 0B483
StateOregon
Coordinates43.3175, -117.1151
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.6 US tons
Inventory rating46.1 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length37 ft (11.3 m)
Longest span35 ft (10.7 m)
Deck width24 ft (7.3 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic156 (2020)
Projected traffic181 by 2025
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed49.7 mi (80 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Succor B483GREELEY over Carter CR built?

It was built in 1988, making it 37 years old in 2025.

What condition is Succor B483GREELEY over Carter CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Succor B483GREELEY over Carter CR carry?

About 156 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is Succor B483GREELEY over Carter CR?

The structure is 37 ft (11.3 m) long with a longest span of 35 ft (10.7 m) and a deck 24 ft wide.

Who owns Succor B483GREELEY over Carter CR?

It is owned by the County Highway Agency.