US 30 (hwy 493) over Snake R. (hwy 493)
GoodMalheur County, Oregon · 0.7 MI E JCT FIA-84 · Structure no. 01000B455 02839
- Built
- 1967
- 58 years old, rebuilt 1985
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 887 ft
- 9 main spans
- Daily traffic
- 26,880
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US 30 (hwy 493) over Snake R. (hwy 493) is a prestressed concrete continuous stringer/multi-beam or girder carrying US 30 (hwy 493) over Snake R. (hwy 493) in Malheur County, Oregon. It was built in 1967 and reconstructed in 1985, so it is 58 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 26,880 vehicles a day, roughly 2% of them trucks, projected to reach 29,500 by 2042. The structure is 887 ft (270.4 m) long and 77 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 30 (hwy 493) over Snake R. (hwy 493) built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 1985.
What condition is US 30 (hwy 493) over Snake R. (hwy 493) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does US 30 (hwy 493) over Snake R. (hwy 493) carry?
About 26,880 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is US 30 (hwy 493) over Snake R. (hwy 493)?
The structure is 887 ft (270.4 m) long with a longest span of 101 ft (30.8 m) and a deck 77 ft wide.
Who owns US 30 (hwy 493) over Snake R. (hwy 493)?
It is owned by the State Highway Agency.