North Williams ST over Albany-Santiam Canal
GoodLinn County, Oregon · 001 N of Cl Wheeler St. · Structure no. 43B009000000000
- Built
- 1967
- 58 years old
- Condition
- Good
- inspected July 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 51 ft
- 1 main span
- Daily traffic
- 268
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
North Williams ST over Albany-Santiam Canal is a prestressed concrete slab carrying North Williams ST over Albany-Santiam Canal in Linn County, Oregon. It was built in 1967, so it is 58 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 268 vehicles a day, roughly 10% of them trucks, projected to reach 515 by 2041. The structure is 51 ft (15.5 m) long and 28 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Williams ST over Albany-Santiam Canal built?
It was built in 1967, making it 58 years old in 2025.
What condition is North Williams ST over Albany-Santiam Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does North Williams ST over Albany-Santiam Canal carry?
About 268 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is North Williams ST over Albany-Santiam Canal?
The structure is 51 ft (15.5 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.
Who owns North Williams ST over Albany-Santiam Canal?
It is owned by the City or Municipal Highway Agency.