2nd ST N over Santiam-Albany Canal

FairPosted for load

Linn County, Oregon · 1200 S. 2nd Street · Structure no. 43B007000000000

Built
1946
79 years old
Condition
Fair
inspected July 2023
Type
Slab
Concrete Continuous
Length
42 ft
2 main spans
Daily traffic
5,665
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

2nd ST N over Santiam-Albany Canal is a concrete continuous slab carrying 2nd ST N over Santiam-Albany Canal in Linn County, Oregon. It was built in 1946, so it is 79 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 5,665 vehicles a day, roughly 10% of them trucks, projected to reach 8,240 by 2041. The structure is 42 ft (12.8 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

Carries2nd ST N
CrossesSantiam-Albany Canal
Location1200 S. 2nd Street
RouteCity Street 0
StateOregon
Coordinates44.53464, -122.90853
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating22.8 US tons
Inventory rating17.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadH 15
Structure length42 ft (12.8 m)
Longest span20 ft (6.1 m)
Deck width44 ft (13.5 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,665 (2021)
Projected traffic8,240 by 2041
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 2nd ST N over Santiam-Albany Canal built?

It was built in 1946, making it 79 years old in 2025.

What condition is 2nd ST N over Santiam-Albany Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does 2nd ST N over Santiam-Albany Canal carry?

About 5,665 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is 2nd ST N over Santiam-Albany Canal?

The structure is 42 ft (12.8 m) long with a longest span of 20 ft (6.1 m) and a deck 44 ft wide.

Who owns 2nd ST N over Santiam-Albany Canal?

It is owned by the City or Municipal Highway Agency.