I-5 (hwy 1) SB over Sodom Ditch
FairLinn County, Oregon · 177 MI N Lane-Linn Line · Structure no. 20397 001 22113
- Built
- 2009
- 16 years old
- Condition
- Fair
- inspected December 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 330 ft
- 3 main spans
- Daily traffic
- 21,606
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-5 (hwy 1) SB over Sodom Ditch is a prestressed concrete continuous box beam or girders - single or spread carrying I-5 (hwy 1) SB over Sodom Ditch in Linn County, Oregon. It was built in 2009, so it is 16 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,606 vehicles a day, roughly 25% of them trucks, projected to reach 24,900 by 2042. The structure is 330 ft (100.6 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-5 (hwy 1) SB over Sodom Ditch built?
It was built in 2009, making it 16 years old in 2025.
What condition is I-5 (hwy 1) SB over Sodom Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does I-5 (hwy 1) SB over Sodom Ditch carry?
About 21,606 vehicles per day (2022 count), of which roughly 25% are trucks.
How long is I-5 (hwy 1) SB over Sodom Ditch?
The structure is 330 ft (100.6 m) long with a longest span of 120 ft (36.6 m) and a deck 63 ft wide.
Who owns I-5 (hwy 1) SB over Sodom Ditch?
It is owned by the State Highway Agency.